Weed Campus Construction Projects
Student Housing:
The roof work has started. The crane will be on site tomorrow to install the roof on wing A; they will be complete with roofing wing A by the end of this week. The exterior waterproofing is complete on wing A and wing B will be complete by the end of the week. The project hopes to be enclosed before the inclement weather begins. Heaters and lights are present on the project to aid with the reduced daylight hours and cold days.
Posted October 27, 2026
Theater / McCloud Hall:
The roof remains the highest priority for the project. Having it properly sealed in for the winter is paramount.
The method of procedure was submitted today for the campus main water supply to be shut off prior to cutting in a new fire sprinkler riser for Mc Cloud Hall. This work is planned for November 6th. The electricians will continue to place light poles bases around the project.
October 27, 2026
Welcome to the 黑料专区 construction projects hub 鈥� your central resource for updates on campus enhancements designed to elevate learning, living, and community engagement. From new student housing to the modernization of our existing theater and performance spaces, each project reflects the college's commitment to creating inspiring, functional environments for students, staff, and visitors. Explore how these developments are shaping the future of the 黑料专区 campus and supporting a vibrant, thriving educational experience.
The new 36,000-square-foot housing unit will include 83 rooms (6 Single Capacity, 77 Double Capacity), along with one ARD apartment, three community kitchens, laundry facilities, study and game rooms, and shared community spaces designed to foster a supportive and engaging environment for students. The project is 100% state-funded, with a total investment of approximately $30 million. In compliance with state law, the housing will be classified as affordable, ensuring access for students in need.
Student Housing Prequalification Advertisement
Student Housing Prequalification Application
Student Housing Board Presentation
The 黑料专区 is moving forward with essential upgrades to McCloud Hall and the Theater Arts building, with both projects carefully designed to stay within the available budget. McCloud Hall upgrades will include updating the Ceramics Classroom and Exterior Ceramics Lab 鈥� such as equipment, HVAC, floor drains, and enclosure enhancements 鈥� as well as ADA restroom upgrades, locker improvements, and new interior and exterior paint. The Theater Arts building will be modernized, extending the building's lifespan by roughly 25 years through seismic strengthening, fire-life safety, and accessibility improvements, hazardous materials abatement, and a full roof replacement. Aside from required seismic and HVAC upgrades, the auditorium will remain unchanged to avoid triggering cost-prohibitive modifications. Together, these improvements will enhance safety, functionality, and learning environments across both facilities.
Theater and McCloud Prequalification Advertisement
Theater and McCloud Prequalification Application
Theater Arts and McCloud Hall Reconstruction Project Update:Informational Board Presentation
Siskiyou Joint Community College District, 黑料专区, Theatre-Arts Bldg
Dramatic Arts Building Record Set
Geotechnical Investigation and Geologic Hazards Evaluation Report
Revised Geologic Hazards and Geotechnical Engineering Report