ºÚÁÏ×¨Çø

ºÚÁÏרÇø Logo

New Lodge Construction

ºÚÁÏרÇø LogoHome Apply Menu Search


Construction Projects

Weed Campus Construction Projects

Student Housing:

The week starting July 27, trenching will begin through parking lot D.

Method of Procedure (PDF)

Posted July 27, 2026


Aerial view of Lodges footings.

The footings are poured. The next major milestone will be the foundation pour scheduled for July 29.

Posted July 20, 2026

Theater / McCloud Hall:
Hazardous Material abatement work begins this week.

Posted July 13, 2026





Welcome to the ºÚÁÏרÇø construction projects hub — your central resource for updates on campus enhancements designed to elevate learning, living, and community engagement. From new student housing to the modernization of our existing theater and performance spaces, each project reflects the college's commitment to creating inspiring, functional environments for students, staff, and visitors. Explore how these developments are shaping the future of the ºÚÁÏרÇø campus and supporting a vibrant, thriving educational experience.

New Student Housing Project

The new 36,000-square-foot housing unit will include 83 rooms (6 Single Capacity, 77 Double Capacity), along with one ARD apartment, three community kitchens, laundry facilities, study and game rooms, and shared community spaces designed to foster a supportive and engaging environment for students. The project is 100% state-funded, with a total investment of approximately $30 million. In compliance with state law, the housing will be classified as affordable, ensuring access for students in need.

Student Housing Project Pre-Qualification Application and Associated Documents

Student Housing Addendum

Student Housing Prequalification Advertisement

Student Housing Prequalification Application

Miscellanous Documents

Student Housing Board Presentation


Theater Arts and Mc Cloud Hall Reconstruction Project

The ºÚÁÏרÇø is moving forward with essential upgrades to McCloud Hall and the Theater Arts building, with both projects carefully designed to stay within the available budget. McCloud Hall upgrades will include updating the Ceramics Classroom and Exterior Ceramics Lab — such as equipment, HVAC, floor drains, and enclosure enhancements — as well as ADA restroom upgrades, locker improvements, and new interior and exterior paint. The Theater Arts building will be modernized, extending the building's lifespan by roughly 25 years through seismic strengthening, fire-life safety, and accessibility improvements, hazardous materials abatement, and a full roof replacement. Aside from required seismic and HVAC upgrades, the auditorium will remain unchanged to avoid triggering cost-prohibitive modifications. Together, these improvements will enhance safety, functionality, and learning environments across both facilities.

Theater / McCloud Hall Project Pre-Qualification Application and Associated Documents

Theater and McCloud Prequalification Advertisement

Theater and McCloud Prequalification Application

Miscellanous Documents

CEQA Addendum

Theater Arts and McCloud Hall Reconstruction Project Update:Informational Board Presentation

Siskiyou Joint Community College District, ºÚÁÏרÇø, Theatre-Arts Bldg

Asbestos Report

Dramatic Arts Building Record Set

Facilities Planning Manual

Facilities Master Plan

Geotechnical Investigation and Geologic Hazards Evaluation Report

Revised Geologic Hazards and Geotechnical Engineering Report

JCAF31 Summary

McCloud Hall Record Set


Contact Us

Office Hours: Monday - Friday, 7:00 am to 4:00 pm
Veronica Rivera
Phone: (530) 938-5233
Email: vrivera@siskiyous.edu